Sunday, September 18, 2011

Deck Renovations- With Curved Brow

Here are the near finished shots of that deck with the dangerous staircase. As you can see a safer staircase was built--away from the septic system. We also built in a storage area beneath the stairs with a landing mid way down to avoid guests tumbling too far if they were to mis-step.

We added a boardwalk out for easy travel to the water--this is a property near Wasaga Beach Ontario. Dan Maragno was the builder and you can see his smiling face on the boardwalk. 
 We paired joists and added a brow to allow more space on the deck. This is no kerf cut temporary brow like you see on TV--this is a solid red cedar lamination using epoxy which will last 30 years. 

 Adding the brow in this case made it possible for a full size dining table on the second level. Dan also took care of a large deficiency list stemming from the deck inspection that spawned this project.

Another masterful job by Dan Maragno--Our Oakville Design Builder!         L
Post a Comment